LEHUNDI equipment is used in petrochemical pipeline maintenance, power plant service, shipbuilding, steel structure fabrication, municipal pipeline construction and industrial equipment maintenance, helping customers complete pipe cutting, beveling, welding preparation and on-site installation work.
LEHUNDI supplied internal expanding pipe beveling equipment for pipeline modification and equipment maintenance in an Indian pharmaceutical plant. The equipment was used for stainless steel pipe end facing, beveling and weld preparation. With internal diameter positioning, it is suitable for small and medium pipe sizes, limited-space areas and pipeline replacement work, helping the site improve pipe end processing efficiency and pre-weld consistency.
LEHUNDI supplied pipe cutting, pipe end processing and assembly support equipment for municipal water network upgrade and on-site repair work in the UAE. The equipment was used for old pipe removal, pipe section replacement, end finishing, weld preparation and site installation, helping the construction team improve pipe handling efficiency in roads, plant areas and utility corridors while reducing manual finishing and waiting time.
LEHUNDI supplied pipe prefabrication cutting, pipe end processing, weld preparation and welding support equipment for a shipyard pipe prefabrication and vessel repair project in Vietnam. The equipment was used for batch pipe prefabrication, repair pipe section replacement, pipe end finishing, pipe section positioning and welding assembly support, helping the shipyard improve pipe processing efficiency and on-site repair flexibility.
LEHUNDI supplied pipe cutting, pipe end processing and assembly support equipment for mining conveying pipeline maintenance and on-site repair work in Chile. The equipment was used for local pipe section replacement, pipe end finishing, weld preparation and on-site installation of slurry pipelines, drainage lines and industrial conveying pipelines, helping the maintenance team improve pipe handling efficiency in complex mining environments while reducing manual grinding and shutdown waiting time.
LEHUNDI supplied external clamping cold cutting, pipe end processing and weld preparation equipment for power pipeline shutdown maintenance and on-site service in South Korea. The equipment was used for fixed pipeline removal, pipe section replacement, end face finishing and bevel processing, helping the maintenance team complete pipe processing within a limited shutdown window while reducing site risks from thermal cutting and later manual grinding time.
Tell us your pipe diameter range, material, wall thickness, site environment and processing requirements. We will recommend suitable cutting, beveling, welding auxiliary or on-site construction equipment based on your actual application.